The Leroy Martin Middle School project involved building replacements and renovating the existing campus. New construction included an administration area, dining facility, gymnasium, plant operations, and a three-story classroom wing. Renovation to the existing auditorium included constructing a new accessibility ramp, enlarging the stage, and adding new seating, lighting, acoustic treatments, electronics, stage rigging, controls, and finishes. The school remained occupied during the 2-year phased construction, which included the design of all temporary services, pedestrian and vehicular routes, and system integration to maintain full school operation.
We enhanced the site with a new running track, softball field, play fields, parking, vehicular circulation, and drop-off areas and also incorporated stormwater reuse into the design.
The completed campus included 125,000 SF of new construction and 48,000 SF of renovation and incorporated several sustainability features.